NOTE: This page contains Request for Proposals (RFPs)/Bids that have already closed. To view currently open RFPs/Bids that are accepting submissions.



How To View RFPs and Bids
In order to ensure your web browser loads the most recent information posted to this page, please perform a refresh or reload of this page each time it is visited.



Closed Bids and RFPs 2018

The following table displays closed bids and RTFs for 2018

Please take into consideration the size of the files to be downloaded. Larger files will require a longer period of time to download, the length of which may be impacted by the speed of your local connection.

ProjectDescriptionDocumentsSupplemental DocumentsClosing Date
RFP 18-001: As Needed Airport Restriping ProjectRequest for Proposals for RFP: 18-001 As Needed Airport Restriping ProjectRequest
for Proposals (pdf)
Friday, January 12, 2018 | 2:00 P.M.
IRP Site 2 Landfill Parking Lot Repairs Construction ProjectNotice Inviting Bids for the IRP Site 2 Landfill Parking Lot Repairs Construction ProjectNotice Inviting Bids (pdf)
Bid Documents (pdf)
Plan Set (pdf)
Pre-Construction Meeting (pdf)
Addendum No. 1 Landfill Construction (pdf)
Bid Log Sheet (pdf)
Tuesday, January 30, 2018 | 2:00 P.M.
18-007 As-Needed Airport Restriping ProjectRequest for Proposals for As Needed Airport Restriping ProjectNotice Inviting Bids (pdf)N/AFriday, February 9, 2018 | 2:00 P.M.
Ramp Joint Seal Replacement and Pavement Repair ProjectNotice Inviting Bids for the Ramp Joint Seal Replacement and Pavement Repair ProjectNotice Inviting Bids (pdf)
Project Manual (pdf)
Drawings (pdf)
Addendum No. 1 (pdf)
Construction Safety and Phasing Plan (pdf)
Non-Mandatory Pre-Bid Meeting Sign In Sheet (pdf)
Bid Log Sheet (pdf)
4/6/2018 | 10:00 A.M.
RFP 18-010: Alarm Monitoring Service Request for Proposals for RFP: 18-010 Alarm Monitoring ServiceRequest
for Proposals (pdf)
Addendum (pdf)Friday, May 25, 2018 | 2:00 P.M.

Mandatory Job Walk: Friday, May 11, 2018 | 1:00 p.m. Inland Valley Development Agency – Administration Building, 1601 East Third Street, San Bernardino, CA 92408
Ramp Joint Seal Replacement and Pavement Repair (RE-BID) ProjectRamp Joint Seal Replacement and Pavement Repair (RE-BID) Project, EDA Grant No. 07-49-06454Notice Inviting Bids (pdf)
Project Manual (pdf)
Drawings (pdf)
Construction Safety and Phasing Plan (pdf)
Non-mandatory Pre-bid Meeting Sign In (pdf)
Addendum No. 1 (pdf)
Bid Log Sheet (pdf)
Friday, June 1, 2018 | 10:00 A.M.
Electrical Service Upgrade Building 795Notice Inviting Bids for Electrical Service Upgrade Building 795 ProjectNotice Inviting Bids (pdf)
Project Manual (pdf)
Construction Safety and Phasing Plan (pdf)
Plans (pdf)
Pre-Bid Meeting Sign In Sheet(pdf)
Bid Log Sheet (pdf)
6/26/2018 | 1:00 P.M.

Mandatory Pre-Bid Meeting: 6/15/2018 | 9:00 A.M.
RFP 19-001: Janitorial ServiceRequest for Proposals for RFP: 19-001 Janitorial ServicesRequest
for Proposals (pdf)
Tuesday, August 7, 2018 | 2:00 P.M.

Mandatory Job Walk: Tuesday, July 24, 2018 | 9:00 a.m. Building 680 (Fire Station) - 165 South Leland Norton Way, San Bernardino, CA 92408
RFP 19-003: Air Traffic Control Tower ServicesRequest for Proposals for RFP: 19-003 Air Traffic Control Tower ServicesRequest for Proposals (pdf)Addendum No. 1 (pdf)Wednesday, September 12, 2018 | 2:00 P.M.

Non-Mandatory Job Walk: Monday, August 27, 2018 | 10:00 a.m. Inland Valley Development Agency - Administration Building/Norton Regional Event Center, 1601 East Third Street, San Bernardino, CA 92408
Notice of Preparation/Initial Study for SBIAA Eastgate Building 1 Project (July 2018) Notice of Preparation/Initial Study for SBIAA Eastgate Building 1 Project (July 2018) NOP - Initial Study (pdf)
Notice of Preparation SBIAA Eastgate Building 1 (July 2018) (pdf)
Appendix 1 (Biology) (pdf)
Appendix 2 (Cultural) (pdf)
Appendix 3 (Geotechnical) (pdf)
Appendix 4 (Phase 1 ESA) (pdf)
Appendix 5 (Drainage Report) (pdf)
Appendix 6 (Traffic Impact Analysis) (pdf)
Notice of Public Hearing (pdf)

Public Comment Meeting (pdf)

Public Comment Meeting Video (youTube video)

Focused Draft Environmental Impact Report (Google Drive)

Appendix 1 (Biology) (pdf)

Appendix 2 (Cultural) (pdf)

Appendix 3 (Geotechnical) (pdf)

Appendix 4 (Phase 1 ESA) (pdf)

Appendix 5 (Drainage Report) (pdf)

Appendix 6 (Traffic Impact Analysis) (pdf)

2019 - Passenger Cars - With Solar (pdf)

2019 - Passenger Cars - Without Solar (pdf)

2019 - Trucks - With Solar (pdf)

2019 - Trucks - Without Solar (pdf)

2024 - Passenger Cars - With Solar (pdf)

2024 - Passenger Cars - Without Solar (pdf)

2024 - Trucks - With Solar (pdf)

2024 - Trucks - Without Solar (pdf)

Focused Final Environmental Impact Report (pdf)
Public Hearing: Friday, October 26, 2018 at 3:00 p.m.

Scoping Meeting: Thursday, August 9, 2018 at 5:30 P.M. | Main Auditorium of the Norton Regional Event Center, 1601 E. Third Street, San Bernardino, CA 92408

Comments accepted until Thursday, August 16, 2018 | 5:00 P.M.